LA Metro Sepulveda Transit Corridor Project (STC)
Owner: Los Angeles County Metropolitan Transportation Authority (Metro)
Location: Los Angeles, California
Date of Performance: May 2022 – Ongoing
Estimated Project Cost: TBD
Project Overview: The Sepulveda Transit Corridor Project aims to establish a fixed-guideway transit service connecting the San Fernando Valley and Los Angeles International Airport through Los Angeles' congested I-405 corridor. Serving over 400,000 daily travelers, the project seeks to address severe congestion and limited public transport options across the Santa Monica Mountains.
Summary: As a sub-consultant to HDR, IDC supports the project with structural engineering and design services, including preparing the Basis of Design documents, design criteria, and standards. IDC provides structural conceptual designs and submits written monthly status reports, ensuring compliance with the PSA and maintaining clear communication about task progress and potential issues.